A fee, in accordance with the following schedule, shall accompany each application for a
zoning certificate, and shall be deposited to the credit of the General Fund of the Village:
|
|
Description |
Amount |
|
1. |
Single-family dwelling |
$50.00 |
|
2. |
Accessory building |
$20.00 per structure |
|
3. |
Two-family dwelling |
$70.00 |
|
4. |
Multiple dwelling |
$50.00 (first unit) $20.00 (per additional unit) |
|
5. |
Addition or alteration to existing dwelling. |
$25.00 |
|
6. |
Commercial or industrial permit (Construction, addition, or alteration) |
$0.03/sq. ft. with a $100 minimum and a $500 maximum fee. |
|
The fee for the application for a zoning certificate for the use of land not involving structures, including changes in the use of land, shall be $10.00.
Additional fees shall be as follows:
|
||
|
8. |
Copy of the Zoning Code |
$10.00 per book |
|
9. |
Copy of the Zoning Map |
$10.00 each |
|
10. |
Fence Permit |
$10.00 |
|
11. |
Pool Permit |
$20.00 |
|
12. |
Sign permit |
$10.00 |
|
13. |
Conditional Use Permit - PC hearing will be held with notice once in a local paper 15 days prior to the hearing. - First class mail notice to those within 200’ of the property will be sent 15 days prior to the PC hearing. |
$100.00 + the current USPS first class mail cost for each person notified. |
|
14. |
BZA Application - BZA hearing will be held with notice once in a local paper 15 days prior to the hearing. - Certified mail to all adjoining property owners will be sent 15 days prior to the hearing. |
$100.00 + the current USPS certified mail cost for each person notified. |
|
15. |
Rezoning Application - PC hearing will be held with two local newspaper notices at least 10 days prior to the hearing. - First class mail notice to those within 200’ of the property will be sent regarding the PC hearing at least 5 days prior to the hearing. - Council hearing will be held with notice once in a local newspaper 30 days prior to the hearing. - First class mail notice to those within 200’ of the property will be sent regarding the Council hearing at least 20 days prior to the hearing |
$300.00 + twice the current USPS first class mail cost for each person notified. |
|
16. |
Subdivision Application - An application form will be completed by the subdivider. - The lot fee and engineering deposit will be paid. - 10 copies of the proposed subdivision will be submitted. - The submission of said material will be provided to the Zoning Inspector 20 calendar days prior to the next regular PC meeting.
|